Tunnels and Shafts

SPIG (Smokeduct plank installation gantry)

Equipment for Handling and Installaion of Prefabricated Elements

The SPIG (Smokeduct Plank Installation Gantry) is equipment designed for the handling and installation of prefabricated planks used to cover tunnel smoke extraction ducts.

The portal structure allows for travel along the tunnel while maintaining full control over load conditions and the stability of the machine-element assembly. The equipment receives the plank within its frame, performing lifting, rotation, and positioning at height through controlled kinematics. Each configuration is custom-engineered based on the geometries, weights, dimensions, and assembly sequences required by the project.

Comprehensive technical and engineering support is provided throughout the entire product lifecycle. To extend the value of the equipment, revamping activities are carried out by assessing its condition and identifying targeted measures to increase service life, improve reliability, and prevent failures. This approach helps reduce environmental impact, contain costs, and return high-performance equipment to service with a significantly extended lifecycle.

Request a Custom Solution